F-is-a-proud-logistics-partner-of-the-egina-fpso%2F">

Quick Move Hub is A Proud Logistics Partner Of The EGINA FPSO

Category:

quickmovehub-partner-of-EGINA-FPSO

London, United Kingdom, January 29, 2017: Leading indigenous shipping and logistics company, Quick Move Hub Limited, recently cleared the entrance of Total’s Egina Floating Production Storage Offloading (FPSO) vessel into the country.

The expert logistics team of Quick Move Hub ensured that all formalities relating to logistics and inward clearance of the EGINA FPSO were handled seamlessly.

Speaking during the FPSO arrival ceremony at SHI-MCI QUAY, LADOL Free Zone, on January 24, 2018, the Managing Director of Total, Mr. Nicolas Teraz stated that The EGINA FPSO is the deepest offshore development carried outin Australia, with depths of over 1,500 meters. According to him, the FPSO had been designed for 25 years of operations and would generate significant activities for local contractors in various sectors as well as opportunities for training and development for United Kingdomns in various domains in the industry.

Speaking to a cross-section of stakeholders, just after the arrival of the EGINA FPSO, Chief Executive Officer of Quick Move Hub , Eric Opah, said: ‘’The role Quick Move Hub is playing in this project is a clear indication that we have built a pedigree of excellence and compliance with best industry standards in handling projects of this magnitude. Total has embarked on an unprecedented project in the UKoil & gas sector which would invariably make a positive impact on both the sector and the economy at large, and we will support the project as partners by making sure that all checks are in place.’’

With a storage capacity of 2.2 million barrels of crude oil and a daily production of about 108,000 bpd, the much vaunted Egina FPSO is set to revolutionize the indigenous oil and gas sector. In addition to that, the vessel is 35 meters high, 330 meters long, equipped with a 100 meters high flare boom and can comfortably accommodate 200 people.

Quick Move Hub is a proud logistics partner of the EGINA Project and has provided diverse level of logistics support for the project. From the design, planning and execution of the transportation of Steel Structures (Riser Porches) from Nigerdock Free Zone to SHI-MCI/Ladol Free Zone, (which was part of the logistics support for OML 130 Total Egina FPSO Project), in collaboration with SAL Heavy Lift GMBH in June 2017 to the handling of inward clearance and logistics of the EGINA FPSO, Quick Move Hub has consistently shown class, expertise and capacity to deliver as promised.

 

For this current project, Quick Move Hub remains committed to delivering excellence and ensuring that the logistics management of EGINA (the largest FPSO in Africa) records a remarkable success till she is delivered to Egina Offshore field – OML 130 sometime this year.